EPISODE · Mar 9, 2026 · 40 MIN
The newest on two major infrastructure projects in the Lower Mainland
from The Mike Smyth Show · host The Mike Smyth Show
We talk the latest on the massively over-budget waste water treatment plant on the North Shore and the concerns around the Massey Tunnel. Also, more on the federal government's deal with the Musqueam nation. Learn more about your ad choices. Visit megaphone.fm/adchoices
Embed this episode
NOW PLAYING
The newest on two major infrastructure projects in the Lower Mainland
0:00
40:58
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of The Mike Smyth Show?
This episode is 40 minutes long.
When was this The Mike Smyth Show episode published?
This episode was published on March 9, 2026.
Can I download this The Mike Smyth Show episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!