Skip to content
The North East Link Monstrosity episode artwork

Jul 7, 2024 2 min

The North East Link Monstrosity

from Report From Tiger Mountain Hosted by Richard Wolstencroft

In this Report, Richard Reports on location from one of the tunnelling sites of Victoria's North East Link Tollway Monstrosity. First costed at $10 billion AUD it has blown out to $26 billion AUD and won't be completed until 2026. After the rain begins Richard does a take two of the Report in the car. The Unshackled Links: Website: https://www.theunshackled.net Facebook: https://www.facebook.com/TUnshackled Twitter: https://twitter.com/Un_shackled Gab: https://gab.com/theunshackled Minds: https://www.minds.com/The_Unshackled/ Telegram: https://t.me/theunshackled MeWe: https://mewe.com/p/theunshackled Instagram: https://www.instagram.com/the_unshackled Bitchute: https://www.bitchute.com/channel/theunshackled/ Free eBook: http://theunshackledbattlefield.net/ Unshackled Productions: WilmsFront: http://www.timwilms.com Trad Tasman Talk: https://www.theunshackled.net/ttt/ The Report from Tiger Mountain: http://reportfromtigermountain.com/ Support Our Work: Membership: http://www.theunshackled.net/membership Donate: https://www.theunshackled.net/donate/ Paypal: https://www.paypal.me/TheUnshackled Store: https://www.theunshackled.net/store/

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

The North East Link Monstrosity

0:00 2:45

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Report From Tiger Mountain?

This episode is 2 minutes long.

When was this Report From Tiger Mountain episode published?

This episode was published on July 7, 2024.

Can I download this Report From Tiger Mountain episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.