The Nuclear Option episode artwork

EPISODE · Nov 14, 2024 · 39 MIN

The Nuclear Option

from Lagnia-Pod · host Lagniappe Daily

A company in Mobile is competing for a contract with the Navy to disassemble the USS Enterprise. If awarded, the famed, nuclear-powered ship would be brought to Mobile Bay as it is disposed of.

Episode metadata supplied by the publisher feed · Published Nov 14, 2024

Embed this episode

NOW PLAYING

The Nuclear Option

0:00 39:59

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Lagnia-Pod?

This episode is 39 minutes long.

When was this Lagnia-Pod episode published?

This episode was published on November 14, 2024.

Can I download this Lagnia-Pod episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!