The Port Mansfield Cut with Rhonda Kennedy episode artwork

EPISODE · Aug 23, 2025 · 30 MIN

The Port Mansfield Cut with Rhonda Kennedy

from The Lost Rider Podcast with Herman Brune · host Herman Brune

Mrs. Rhonda Kennedy explains to listeners that the Port Mansfield Cut was opened by the Army Corps of Engineers in 1957. While Port Mansfield is no longer a sea-going port, the cut is instrumental to the health of the Lower Laguna Madre. It also allows access to the Gulf from Port Mansfield. Presently, the Cut is silting shut and the Army Corps of Engineers has no plans to continuing its dredging. The people in Port Mansfield are looking for more interested parties to help keep the Cut open. 

Episode metadata supplied by the publisher feed · Published Aug 23, 2025

Embed this episode

Ready to play

The Port Mansfield Cut with Rhonda Kennedy

0:00 30:28

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Lost Rider Podcast with Herman Brune?

This episode is 30 minutes long.

When was this The Lost Rider Podcast with Herman Brune episode published?

This episode was published on August 23, 2025.

Can I download this The Lost Rider Podcast with Herman Brune episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!