F
The Post-Sandy Rebuilding Rush
from flood_zone
WNYC investigative reporter Robert Lewis discusses a government-approved $776 million effort to rebuild in flood-prone areas, as a WNYC and ProPublica investigation revealed. Read Robert's story and see the map.
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of flood_zone?
This episode is 15 minutes long.
When was this flood_zone episode published?
This episode was published on March 7, 2013.
Can I download this flood_zone episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.