The Power Grab episode artwork

EPISODE · Jan 13, 2026 · 55 MIN

The Power Grab

from Firewall with Bradley Tusk

What will trigger the fiercest backlash to the AI boom? Rather than job losses or generative-AI weirdness, says Bradley, it'll be data centers and their insatiable appetite for electricity. When utility bills start climbing, voters everywhere will make their wrath felt. Which means new power sources are in hot demand. Can we develop them fast enough to head off a crisis? Plus: Bradley reflects on how “having nice things” (like the little gem of a bar he discovered in Miami) rests on thousands of trust-based transactions and presents a working theory on why Mayor Mamdani’s early flashes of progressive posturing could be more strategic than they look.This episode was taped at P&T Knitwear at 180 Orchard Street — New York City’s only free podcast recording studio.Send us an email with your thoughts on today’s episode: [email protected] sure to watch Bradley’s new TED Talk on Mobile Voting at https://go.ted.com/bradleytusk.Subscribe to Bradley's weekly newsletter and follow Bradley on Linkedin + Substack + YouTube.

Episode metadata supplied by the publisher feed · Published Jan 13, 2026

Embed this episode

NOW PLAYING

The Power Grab

0:00 55:09

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Firewall with Bradley Tusk?

This episode is 55 minutes long.

When was this Firewall with Bradley Tusk episode published?

This episode was published on January 13, 2026.

Can I download this Firewall with Bradley Tusk episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!