Skip to content
Preconstruction Reviews That Kill Change Orders Early | Jeff Metzger episode artwork

Aug 7, 2026 36 min

Preconstruction Reviews That Kill Change Orders Early | Jeff Metzger

from Beyond the Bid | Practical AI for Builders Hosted by GO First

Walk your own floor plan at full scale before your next project gets priced: https://www.projectivestudios.comEvery client who walks into this studio finds 10 to 15 items they want to revise on plans they already approved. Not change orders. Revisions caught before anything is ordered, poured, or framed. Jeff Metzger spent 15 years building wind farms, gold mines, healthcare facilities, and high-end custom homes, and he got tired of watching a small oversight on paper turn into a permanent problem on site.So he built the only projection studio in the country with three adjacentprojection walls. Architects, builders, and their clients walk a plan at 1:1 scale on a 2,300 square foot floor, stage furniture on it, wheel a chair up to a reception desk, and find out what the drawing set never told them. In this episode Jeff walks through the Children's Museum project that planned four people behind a grand entrance desk and could not fit two once it hit the floor at full size.The part most builders miss is what happens next. That desk fix touched the soffit above it, the cloud ceilings tied into that soffit, and electrical rough-ins already poured into concrete. Jeff's rule from 15 years on site: any change in construction moves at least four or five other scopes. He also breaks down the five or six door swing conflicts caught on a typical plan, against a 12-week lead time on a door right now.No Revit file. No 3D model. No new software to learn. The same PDFs and JPEGs already going to your clients and your subs, sent a day ahead. One hour on the floor replaces about a dozen design meetings where nobody decided anything.Design partners who run one session put it in their proposal for every job after that.OTHER JEFF METZGER RESOURCES 🔗- Book a full-scale walkthrough of your plans: https://www.projectivestudios.com- See what a session actually looks like: https://www.instagram.com/projectivestudios- Monthly open house and networking event: https://www.projectivestudios.com🎯 Get in Touch with Beyond the Bid- Instagram: @beyondthebid.co- LinkedIn: /in/grantfuellenbach- Website: https://www.beyondthebid.co- Email: [email protected]:00 Introduction00:45 What is Projective?01:45 Value and Risk Mitigation03:15 Real-World Use Cases08:40 Advanced Projection Setup12:25 The Booking Process15:15 White Glove Client Experience24:35 Live Demo and Walkthrough32:35 Closing and Future Events---The information in this episode is for general informational purposes only and does not constitute financial, legal, or professional construction advice. Always consult qualified professionals for your specific situation. Guest claims and figures are the guest's own.© 2026 GO First Consulting. All rights reserved.If this saved you one change order, hit Like so another builder finds it. Drop the most expensive thing you've ever caught late in the comments. Subscribe for weekly systems breakdowns, your competitors already have. Send this to the partner who still thinks the plans are fine.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Preconstruction Reviews That Kill Change Orders Early | Jeff Metzger

0:00 36:23

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Beyond the Bid | Practical AI for Builders?

This episode is 36 minutes long.

When was this Beyond the Bid | Practical AI for Builders episode published?

This episode was published on August 7, 2026.

Can I download this Beyond the Bid | Practical AI for Builders episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.