EPISODE · Sep 1, 2020 · 25 MIN
The Riverwalk Puzzle is Close to Being Completed - An Interview With Riverfront Conservancy CEO Mark Wallace
from The Week That Was on Deadline Detroit · host Craig Fahle / Deadline Detroit
Craig's guest is Mark Wallace, President and CEO of the Detroit Riverfront Conservancy about the latest expansion of the Riverwalk. Work has officially begun on the long vacant Uniroyal property, which will allow for the public to access the entire waterfront from east of the Belle Isle Bridge to Downtown Detroit. The Uniroyal site, due to environmental contamination, has been a difficult piece of the Riverwalk puzzle to solve.
What this episode covers
Craig's guest is Mark Wallace, President and CEO of the Detroit Riverfront Conservancy about the latest expansion of the Riverwalk. Work has officially begun on the long vacant Uniroyal property, which will allow for the public to access the entire waterfront from east of the Belle Isle Bridge to Downtown Detroit. The Uniroyal site, due to environmental contamination, has been a difficult piece of the Riverwalk puzzle to solve.
NOW PLAYING
The Riverwalk Puzzle is Close to Being Completed - An Interview With Riverfront Conservancy CEO Mark Wallace
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.