The saga of the Gordie Howe bridge episode artwork

EPISODE · Jul 27, 2026 · 30 MIN

The saga of the Gordie Howe bridge

from Front Burner

Today, the Gordie Howe Bridge is set to officially open to the public, connecting Windsor, Ontario to Detroit, Michigan. Its ceremonial opening on Friday was a one-sided affair. It was originally supposed to be a joint ceremony with U.S. officials, but that was cancelled after President Donald Trump announced his plans to hit Canada with a new whack of tariffs. That’s just one of the many bumps in the road to getting this bridge open.CBC Windsor reporter Emma Loop has been reporting on the Gordie Howe Bridge for years. She talks about the long journey to the opening, and how it represents the Canada-U.S. relationship writ large.For transcripts of Front Burner, please visit: https://www.cbc.ca/radio/frontburner/transcripts

Episode metadata supplied by the publisher feed · Published Jul 27, 2026

Embed this episode

Ready to play

The saga of the Gordie Howe bridge

0:00 30:36

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Front Burner?

This episode is 30 minutes long.

When was this Front Burner episode published?

This episode was published on July 27, 2026.

Can I download this Front Burner episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!