The Ship Report: The USCGC Healy, a Coast Guard icebreaker, leaves Portland today episode artwork

EPISODE · Jun 30, 2026 · 9 MIN

The Ship Report: The USCGC Healy, a Coast Guard icebreaker, leaves Portland today

from The Ship Report · host The Ship Report

The Ship Report, Tuesday, June 30, 2026Today, an "unusual ship alert" for a unique US Coast Guard ship that we hardly ever see on the Columbia. The USCG Cutter Healy, the Guard's largest ship and an icebreaker, has been at the Portland Vigor shipyard since January for maintenance and repairs.She heads downriver and out to sea today. We'll talk about her unusual mission and capabilities, which include breaking through 4.5 feet of solid ice, and hosting scientific crews hoping to study high latitude waters near the North Pole.

Episode metadata supplied by the publisher feed · Published Jun 30, 2026

Embed this episode

NOW PLAYING

The Ship Report: The USCGC Healy, a Coast Guard icebreaker, leaves Portland today

0:00 9:07

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Ship Report?

This episode is 9 minutes long.

When was this The Ship Report episode published?

This episode was published on June 30, 2026.

Can I download this The Ship Report episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!