The State of Co-Location. The Way forward for Hybrid PPA episode artwork

EPISODE · Oct 2, 2025 · 34 MIN

The State of Co-Location. The Way forward for Hybrid PPA

from The Pexapark Podcast

Welcome back to The Pexapark Podcast! In the first part of the episode, we look at key market shifts: Germany launches a €500m guarantee scheme to revive its stalled PPA market, Italy’s FER-X auction confirms solar’s dominance with many projects now turning to PPAs at €54–60/MWh, and the Netherlands injects €1.2bn to rescue offshore wind. Battery revenues in Europe dipped on weak summer volatility but are already recovering, while the U.S. set a record with 4.9 GW of new storage in one quarter. In the second half, Jens Holstein – EVP Advisory at Pexapark – joins Luca Pedretti to explore the state of co-location. Enjoy a discussion on themes including:Why co-location is becoming the “route to market” for solar as standalone PPAs struggleHybrid PPAs and enhanced profiles: using one battery cycle to shift solar output from noon to evening, lifting capture rates from ~60% to 90%.Market outlook: Germany and the Netherlands lead on volatility-driven value, GB favors separate contracts, while Spain and Italy remain subsidy- and auction-drivenEarly but fast growth: ~3 GW of co-located capacity contracted in 2025 vs 14.5 GW standalone, with two-thirds of new GB solar projects now co-locatedRepowering as the next wave: hybridizing older German wind sites with solar and batteriesUnlock More PPA Market InsightsRegister for your free Pexapark account to stay updated on the latest energy transition trends. Learn more >

Episode metadata supplied by the publisher feed · Published Oct 2, 2025

Embed this episode

Welcome back to The Pexapark Podcast! In the first part of the episode, we look at key market shifts: Germany launches a €500m guarantee scheme to revive its stalled PPA market, Italy’s FER-X auction confirms solar’s dominance with many projects now turning to PPAs at €54–60/MWh, and the Netherlands injects €1.2bn to rescue offshore wind. Battery revenues in Europe dipped on weak summer volatility but are already recovering, while the U.S. set a record with 4.9 GW of new storage in one quarte...

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

The State of Co-Location. The Way forward for Hybrid PPA

0:00 34:52

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Pexapark Podcast?

This episode is 34 minutes long.

When was this The Pexapark Podcast episode published?

This episode was published on October 2, 2025.

Can I download this The Pexapark Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!