EPISODE · Sep 10, 2026 · 40 MIN
The State of Europe's Data Centre Build with Michael Winterson of EUDCA
from The Pexapark Podcast · host Pexapark
Welcome back to The Pexapark Podcast!In the first part of the episode, Luca Pedretti talks to Michael Winterson, CEO of the European Data Centre Association, about how Europe’s data center industry plans to power its next stage of growth. Michael walks through why Europe’s data center market is only about half the size of the US and Chinese markets, why capital is no longer the industry’s bottleneck, and why grid access has become its single biggest constraint, along with why onsite gas generation, common in the US, has little traction in Europe.Key themes from the discussion include:Why Europe’s data center market is about half the size of the US and China, even as growth accelerates to 15–20% a yearHow capital committed to European data centers has more than doubled year over yearWhy grid connection delays, not capital or demand, are now the industry’s central bottleneckWhy onsite gas generation, common in the US, is not seen as a viable path forward in EuropeHow EU programs like the AI Gigafactory initiative and the Cloud and AI Development Act aim to reindustrialize sites and build sovereign digital infrastructureWhy efficiency, sustainability, and additionality rules are making renewable PPAs central to how data centers get rated and permittedIn the second part of the episode, Luca turns to recent Pexapark market intelligence. He looks at wind imbalance costs in the Nordics, which spiked in 2025 before easing through 2026 on 15-minute imbalance settlement, TSO actions, and new Aurora line transmission capacity into northern Sweden, though costs remain above pre-2025 levels in most markets. He then turns to Germany, where competition among direct marketers is compressing fees for solar and wind contracts, with some marketers now paying producers to take their power, particularly for wind in the southwest and, more unusually, for solar in the north.NOTESState of European Data Centres 2026 ReportUnlock More PPA Market InsightsRegister for your free Pexapark account to stay updated on the latest energy transition trends. Learn more >
Embed this episode
What this episode covers
Welcome back to The Pexapark Podcast! In the first part of the episode, Luca Pedretti talks to Michael Winterson, CEO of the European Data Centre Association, about how Europe’s data center industry plans to power its next stage of growth. Michael walks through why Europe’s data center market is only about half the size of the US and Chinese markets, why capital is no longer the industry’s bottleneck, and why grid access has become its single biggest constraint, along with why onsite gas gene...
Ready to play
The State of Europe's Data Centre Build with Michael Winterson of EUDCA
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.