The Toronto Subway: Episode 134
from The Red Line Podcast
Today on the show we're discussing the good 'ol Toronto Subway, which is the second busiest rapid transit system in Anglophone North America. Just why is Toronto's (relatively) small system so successful, and where might it be going next? All this, after The News. Links and stuffs Merch:https://shop.trlpod.com/ Twitter:@TheRedLine_pod YouTube channel:The Red Line Podcast Spotify:The Red Line Podcast Patreon:https://www.patreon.com/theredlinepodcasters Email:[email protected] Website:https://www.trlpod.com/ Timestamps 0:00 Intro & low-floor Seattle rant 3:27 Trvke 9:08 The News 12:39 News end 19:44 Opening in 1954 22:15 Plans for a second line using the Prince Edward Viaduct 25:35 Extensions everywhere, including to Finch 27:46 Hawker-Siddley trains 31:45 NDP plan for a 5-stop Sheppard subway 33:58 2014's numbering of the lines 35:24 Future extensions incl. the Ontario relief line 43:00 Gawking at the ridership 44:42 Patrons References & notes [1]Mass Transit: Amtrak re-opens East River Tunnel after year of construction [2]American Public Transportation Association: Public Transportation Ridership Report, First Quarter 2026 [3]BART: March 2026 Monthly Ridership Snapshot [4]Wikipedia: Toronto subway § Expansion plans [5]Wikipedia: Toronto subway rolling stock [6]Wikipedia: Line 1 Yonge–University § History [7]Wikipedia: Line 2 Bloor–Danforth § Subway construction [8]Wikipedia: Line 4 Sheppard [9]City of Toronto: Canada's First Subway [10]Wikipedia: Toronto subway [11]CSCE/SCGC: Toronto Subway [12]Transit Toronto: A History of the Original Yonge Subway [13]The Canadian Encyclopedia: Toronto Subway [14]Metro Liner: Evolution of the Toronto Subway 1954-2030s (geographic map) [15]Transit Toronto: Map of original subway routing
Embed this episode
No transcript yet.