The Unilateral Change Order
from Build America Podcast Hosted by Scott Jennings
The purpose of a change order is to add work to an existing contract. Ideally this work is added with mutually agreeable terms in scope, time, and cost. These terms often cannot be agreed upon and contractors feel coerced into signing the document. Consider not signing the change order. http://sjcivil.net/white-paper/the-unilateral-change-order/
Embed this episode
No transcript yet.
Similar podcasts
Frequently asked questions
How long is this episode of Build America Podcast?
This episode is 6 minutes long.
When was this Build America Podcast episode published?
This episode was published on July 13, 2018.
Can I download this Build America Podcast episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.