The Why: Powering data centers
from The Chris & Joe Show
Why do power companies raise their rates for everyone instead of just sending the bill to the data centers?
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of The Chris & Joe Show?
This episode is 7 minutes long.
When was this The Chris & Joe Show episode published?
This episode was published on August 18, 2025.
Can I download this The Chris & Joe Show episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.