Tim Nelson – on his early career and the tortured history of Australian energy policy episode artwork

EPISODE · Feb 10, 2023 · 1H 13M

Tim Nelson – on his early career and the tortured history of Australian energy policy

from Inside Infrastructure

Adrian and Ilya sat down with Executive General Manager Australian Energy Market Commission Tim Nelson to discuss his early career, the tortured history of energy policy in Australia, and what the Commission is doing to optimise its regulatory frameworks to integrate a new wave of technological disruption.

Episode metadata supplied by the publisher feed · Published Feb 10, 2023

Embed this episode

Ready to play

Tim Nelson – on his early career and the tortured history of Australian energy policy

0:00 1:13:16

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Inside Infrastructure?

This episode is 1 hour and 13 minutes long.

When was this Inside Infrastructure episode published?

This episode was published on February 10, 2023.

Can I download this Inside Infrastructure episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!