Toronto transit facing backlash for not extending service after World Series Game 7 episode artwork

EPISODE · Nov 4, 2025 · 5 MIN

Toronto transit facing backlash for not extending service after World Series Game 7

from DEEP INSIGHT · host WAK Media

Toronto's public transit agencies, the TTC and Metrolinx, faced significant backlash for not adequately extending service following the conclusion of World Series Game 7 on Saturday, November 2, 2025. The game, which went into extra innings, ended around 12:20 a.m., leaving thousands of fans with limited time to catch the last trains. Become a supporter of this podcast: https://www.spreaker.com/podcast/deep-insight--6597619/support.Don't miss our episode. Follow us for update newsday for you, smart netizen.

Episode metadata supplied by the publisher feed · Published Nov 4, 2025

Embed this episode

NOW PLAYING

Toronto transit facing backlash for not extending service after World Series Game 7

0:00 5:22

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of DEEP INSIGHT?

This episode is 5 minutes long.

When was this DEEP INSIGHT episode published?

This episode was published on November 4, 2025.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this DEEP INSIGHT episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!