Toronto’s Green Pathways Get Connected | Toronto News episode artwork

EPISODE · Jul 17, 2026 · 1 MIN

Toronto’s Green Pathways Get Connected | Toronto News

from Toronto News Today | 2 Min News | The Daily News Now!

Toronto’s about to stitch together two major green gems—the Loop Trail and The Meadoway—filling a critical gap in its trail network and paving the way for a seamless, 80-kilometer urban wilderness loop. Part of the city’s bold Ravine Strategy, this connection will link Rouge National Urban Park, the Loop, and The Meadoway into one continuous path, with new sections opening by summer 2026 and full completion by end of 2027. As trails like the East Don Trail recently closed another gap, Toronto’s parks are exploding with activity—including an Indigenous-led renaming of the Lower Don by 2027 and the launch of Biidaasige Park’s waterfront art trail by late July 2026. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/c705e79f35eb84a6

Episode metadata supplied by the publisher feed · Published Jul 17, 2026

Embed this episode

NOW PLAYING

Toronto’s Green Pathways Get Connected | Toronto News

0:00 1:21

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Toronto News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Toronto News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on July 17, 2026.

Can I download this Toronto News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!