EPISODE · Jun 23, 2026 · 4 MIN
Trains delayed and cancelled by thieves stealing crucial infrastructure
from Checkpoint
People pilfering crucial bits of rail infrastructure are causing major headaches for KiwiRail with disruptions to Wellington freight and commuter services. Signals, cables and overhead lines have all been stolen. During April, services on the Hutt Valley line had to be cancelled several times and dozens of services delays because of stolen equipment. KiwiRail Chief Metros Officer David Gordon spoke to Lisa Owen.
Embed this episode
NOW PLAYING
Trains delayed and cancelled by thieves stealing crucial infrastructure
No transcript for this episode yet
Similar Episodes
No similar episodes found.