EPISODE · Mar 7, 2026 · 28 MIN
Transmission Upgrades for Offshore Wind
from EcoNews Report · host The Green Gang
For offshore wind to fight climate change, that power needs to reach the larger statewide grid where it can replace fossil fuel electricity generation. The catch? Humboldt's current transmission lines are too small to transmit that power out of Humboldt. New transmission infrastructure has been proposed to solve this problem, with the California Independent System Operator selecting Viridon to build new 500kV transmission lines. While this is a big project, new analysis from the Schatz Energy Research Center found that the cost to California ratepayers is low, about $1.68 per year. Tanner Etherton, Awbrey Yost and Jim Zoellick from Schatz join the show to nerd out over transmission infrastructure planning.For more info, check out these recently-released Schatz reports:North Coast Offshore Wind Transmission Infrastructure Ratepayer Cost Impact AnalysisPower Behind the Redwood Curtain: A History of Electric Transmission and Natural Gas Infrastructure in Humboldt County Have other questions about offshore wind? Check out northcoastoffshorewind.org.Support the show
What this episode covers
For offshore wind to fight climate change, that power needs to reach the larger statewide grid where it can replace fossil fuel electricity generation. The catch? Humboldt's current transmission lines are too small to transmit that power out of Humboldt. New transmission infrastructure has been proposed to solve this problem, with the California Independent System Operator selecting Viridon to build new 500kV transmission lines. While this is a big project, new analysis from the Schatz Energy...
NOW PLAYING
Transmission Upgrades for Offshore Wind
No transcript for this episode yet
Similar Episodes
Jun 20, 2026 ·2m
Jun 20, 2026 ·2m
Jun 15, 2026 ·3m
Jun 15, 2026 ·3m
Jun 14, 2026 ·2m
Jun 14, 2026 ·2m