EPISODE · Sep 14, 2026 · 1 MIN
Tri-Town Trail Costs Hit $71M | Montpelier News
from Montpelier News Today | 2 Min New | The Daily News Now!
A major $71 million trail project connecting Proctor, Pittsford, and West Rutland is nearing a decision point after a new study reveals the preferred plan—a 23-mile loop for recreation and transit. A public meeting on September 23rd will let residents weigh in before officials decide next steps, with funding and cost concerns looming large as even the cheapest option clocks in at $18 million. The towns have already spent only what was needed for the feasibility study, funded by a grant and small local contributions. Community input could shape whether this ambitious, multi-use trail becomes reality. Listen in comfort: Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN: [email protected] This is an automated, high-level news summary based on public reporting. Sources: https://www.rutlandherald.com/news/local/trail-study-for-proctor-pittsford-and-west-rutland-seeks-public-input/article_9cc4cc73-d810-5a6c-be7f-a482f4afadd0.html More coverage & latest updates: https://sources.thednn.ai/db5ab4b42520212a Report issues to [email protected].
Embed this episode
Ready to play
Tri-Town Trail Costs Hit $71M | Montpelier News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.