Trump Admin Pauses Funds For Red Line Extension episode artwork

EPISODE · Oct 7, 2025 · 30 MIN

Trump Admin Pauses Funds For Red Line Extension

from In the Loop with Sasha-Ann Simons · host WBEZ Chicago

The Trump administration has paused $2.1 billion in federal funding for infrastructure projects in Chicago, including the long-awaited extension of the Red Line. In the Loop discusses the impact of this pause on residents, public transit and the environment with Greater Roseland Chamber of Commerce executive director Andrea Reed, UChicago Harris School of Public Policy research professor Justin Marlowe and In the Loop sustainability contributor Karen Weigert. For a full archive of In the Loop interviews, head over to wbez.org/in-the-loop.

Episode metadata supplied by the publisher feed · Published Oct 7, 2025

Embed this episode

NOW PLAYING

Trump Admin Pauses Funds For Red Line Extension

0:00 30:11

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of In the Loop with Sasha-Ann Simons?

This episode is 30 minutes long.

When was this In the Loop with Sasha-Ann Simons episode published?

This episode was published on October 7, 2025.

Can I download this In the Loop with Sasha-Ann Simons episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!