EPISODE · Aug 16, 2018 · 27 MIN
U.S. Open Louis Armstrong Stadium Architect Matt Rossetti
from Beyond The Baseline: SI's Tennis Podcast with Jon Wertheim · host SI Tennis | Jon Wertheim
On this week's episode, Jamie Lisanti steps in to host for Jon Wertheim and she talks with Matt Rossetti, the president, CEO and "chief architect of fun" for ROSSETTI, the lead architecture firm behind the five-year design and transformation of the USTA Billie Jean King National Tennis Center and more specifically, the new Louis Armstrong Stadium making its debut at the 2018 U.S. Open. Rossetti discusses the overall design process and vision for the new, $200 million stadium, which will feature a retractable roof, seating for about 41,000 spectators, a special natural ventilation system and more. Advertising Inquiries: https://redcircle.com/brandsPrivacy & Opt-Out: https://redcircle.com/privacy
Embed this episode
Ready to play
U.S. Open Louis Armstrong Stadium Architect Matt Rossetti
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.