U.S. Power Plant New Build Cycle — a Master Class in ERCOT and PJM episode artwork

EPISODE · May 28, 2025 · 23 MIN

U.S. Power Plant New Build Cycle — a Master Class in ERCOT and PJM

from Power Plays · host CoBank

The largest grid operator in the U.S., PJM, has more than 3,000 active projects in its interconnection queue, more than four other ISOs combined. And it used to be easy to build in Texas, but ERCOT is facing the same challenges as other regions. Spearmint Energy’s Andrew Waranch and Gina Wolf examine the nuances of building ISO supply in this episode of Power Plays. 

Episode metadata supplied by the publisher feed · Published May 28, 2025

Embed this episode

NOW PLAYING

U.S. Power Plant New Build Cycle — a Master Class in ERCOT and PJM

0:00 23:57

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Power Plays?

This episode is 23 minutes long.

When was this Power Plays episode published?

This episode was published on May 28, 2025.

Can I download this Power Plays episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!