U.S. Power Plant New Build Cycle — a Master Class in MISO and SPP episode artwork

EPISODE · Apr 30, 2025 · 24 MIN

U.S. Power Plant New Build Cycle — a Master Class in MISO and SPP

from Power Plays · host CoBank

Why exactly is the middle of the U.S. running out of power? In this episode of Power Plays, Spearmint Energy’s Andrew Waranch and Gina Wolf examine building new supply with MISO and SPP. In these two regions, new generation project queues are lengthy and community opposition is high. We look at what it will take to build back a safe reserve of supply for consumers. 

Episode metadata supplied by the publisher feed · Published Apr 30, 2025

Embed this episode

NOW PLAYING

U.S. Power Plant New Build Cycle — a Master Class in MISO and SPP

0:00 24:40

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Power Plays?

This episode is 24 minutes long.

When was this Power Plays episode published?

This episode was published on April 30, 2025.

Can I download this Power Plays episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!