EPISODE · Jul 2, 2026 · 43 MIN
Um investimento superior a 21 milhões euros.
from Portugal em Direto · host Antena1 - RTP
Centro Desportivo Nacional do Jamor prepara-se para uma das maiores requalificações dos últimos anos. As obras devem estar concluídas dentro de 2 anos e meio. Edição de Cláudia Costa. See omnystudio.com/listener for privacy information.
Embed this episode
Ready to play
Um investimento superior a 21 milhões euros.
0:00
43:49
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Portugal em Direto?
This episode is 43 minutes long.
When was this Portugal em Direto episode published?
This episode was published on July 2, 2026.
Can I download this Portugal em Direto episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!