Upgraded Hydraulic Bridge Improves Milwaukee Infrastructure episode artwork

EPISODE · May 24, 2021 · 30 MIN

Upgraded Hydraulic Bridge Improves Milwaukee Infrastructure

from Fluid Power Forum

Jim Hoenle is a Lead Engineer at MFP Automation Engineering, a top distributor of motion control, fluid power and automation products in the U.S. We invited Jim into our forum to learn about MFP's involvement in a moveable bridge project located right here in NFPA's stomping grounds: Milwaukee, Wisconsin. Learn more about the bridge project: http://blog.parker.com/michigan-street-bridge-in-milwaukee-rehabbed-with-parker-hydraulics  Contact Jim: [email protected] Connect with the host Eric Lanke at [email protected] or on Twitter @ericlanke

Episode metadata supplied by the publisher feed · Published May 24, 2021

Embed this episode

NOW PLAYING

Upgraded Hydraulic Bridge Improves Milwaukee Infrastructure

0:00 30:24

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Fluid Power Forum?

This episode is 30 minutes long.

When was this Fluid Power Forum episode published?

This episode was published on May 24, 2021.

Can I download this Fluid Power Forum episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!