UPS Reality Check: Batteries, Runtime, and Resilience in Commercial Buildings episode artwork

EPISODE · Jun 9, 2026 · 8 MIN

UPS Reality Check: Batteries, Runtime, and Resilience in Commercial Buildings

from Built, Wired & Secured

In this 10-minute interview Alex Morgan sits down with commercial operations leader Michael Harrington to peel back the assumptions that make UPS systems a hidden risk in buildings. We open with a real-world scenario: a short outage where backup power didn’t deliver as expected. The conversation covers root causes—aging batteries, insufficient maintenance, mismatched runtime expectations, and single points of failure—then moves to tradeoffs between centralized vs. distributed UPS, runtime sizing, testing practices, and maintenance contracts. Michael shares concrete examples from property operations and capital planning, including low-cost changes that materially improve resilience. Listeners will leave with a pragmatic checklist for audits, testing cadence, documentation handoffs, and vendor oversight so facilities and IT teams can reduce surprises and protect tenant operations.

Episode metadata supplied by the publisher feed · Published Jun 9, 2026

Embed this episode

NOW PLAYING

UPS Reality Check: Batteries, Runtime, and Resilience in Commercial Buildings

0:00 8:12

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Built, Wired & Secured?

This episode is 8 minutes long.

When was this Built, Wired & Secured episode published?

This episode was published on June 9, 2026.

Can I download this Built, Wired & Secured episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!