#vBrownBag EMEA VCP6-CMA Objective 4 - Configure and Administer Tenants and Business Groups with Guiliano Bertello @GiulianoBerteo and Craig Gumbley @_chelnak episode artwork

EPISODE · Jan 31, 2016 · 49 MIN

#vBrownBag EMEA VCP6-CMA Objective 4 - Configure and Administer Tenants and Business Groups with Guiliano Bertello @GiulianoBerteo and Craig Gumbley @_chelnak

from vBrownBag

#vBrownBag EMEA VCP6-CMA Objective 4 - Configure and Administer Tenants and Business Groups with Guiliano Bertello and Craig Gumble#vBrownBag EMEA VCP6-CMA Objective 4 - Configure and Administer Tenants and Business Groups with Guiliano Bertello @GiulianoBerteo and Craig Gumbley @_chelnak

Episode metadata supplied by the publisher feed · Published Jan 31, 2016

Embed this episode

Ready to play

#vBrownBag EMEA VCP6-CMA Objective 4 - Configure and Administer Tenants and Business Groups with Guiliano Bertello @GiulianoBerteo and Craig Gumbley @_chelnak

0:00 49:57

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of vBrownBag?

This episode is 49 minutes long.

When was this vBrownBag episode published?

This episode was published on January 31, 2016.

Can I download this vBrownBag episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!