VDOT Road Report: Bridge Repairs & I-81 Widening at Strasburg episode artwork

EPISODE · Jul 7, 2025 · 25 MIN

VDOT Road Report: Bridge Repairs & I-81 Widening at Strasburg

from The Valley Today · host Janet Michael

In this latest edition of 'The Valley Today,' host Janet Michael engages in a comprehensive discussion with Ken Slack, a communication specialist for the Staunton District of VDOT. The conversation revolves around various crucial road improvement projects and provides insights into the progress and challenges faced by VDOT. Highlighting bridge maintenance and replacements, Ken explained the ongoing work on the 66 overpass in Front Royal, slated for completion by the end of July. Ken detailed the comprehensive repainting process of the I-66 bridges over Route 345 22, emphasizing its importance in maintaining the structural integrity of the 3,500 bridges and culverts managed by VDOT. The conversation then shifted to the significant Rockland Road project, which promises to eliminate train-related traffic delays. Ken anticipated the Rockland Road bridge to open before the summer's end, a notable achievement given its original Spring 2026 completion date. Discussion also addressed the extensive widening of Interstate 81 in Strasburg, set for completion by fall 2028. Ken pointed out the complexities of this $59 million project, encompassing four miles of southbound expansion, with additional bridge replacements over Cedar Creek and the CSX railway. Beyond these specific projects, the duo discussed the broader I-81 Corridor Improvement Program. Ken shared insights into upcoming public meetings aimed at gathering feedback on potential solutions for congestion and safety issues along this vital corridor. The balance between public input and comprehensive traffic studies aims to refine and prioritize future improvements. The discussion concluded with updates on other key projects, including the Old Charlestown Road Bridge replacement and the dissemination of information via VDOT's website and social media channels. Ken reassured listeners of VDOT's commitment to transparency and community involvement in their ongoing and upcoming works.

Episode metadata supplied by the publisher feed · Published Jul 7, 2025

Embed this episode

NOW PLAYING

VDOT Road Report: Bridge Repairs & I-81 Widening at Strasburg

0:00 25:40

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Valley Today?

This episode is 25 minutes long.

When was this The Valley Today episode published?

This episode was published on July 7, 2025.

Can I download this The Valley Today episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!