Skip to content
Wait, that's MY yard! episode artwork

EPISODE · Aug 28, 2019 · 18 MIN

Wait, that's MY yard!

from Madison's Everyday Engineering

After a large conversation about bus stop and pad placement in the City of Madison over the summer, Engineering wants to share what the City can and can’t do within the Public Right of Way. In June 2018, a resident was unhappy about a bus pad, or concrete slab, being installed in her front yard. After consistent media coverage about the bus pad involved in an Engineering project, the division heard from residents and realized the public doesn’t always understand what the Public Right of Way is. In this podcast, City of Madison Engineering Division Public Information Officer Hannah Mohelnitzky hosts Principal Engineer Christy Bachmann and Deputy City Engineer Greg Fries to chat about ways every resident can understand what part of their yard is susceptible to construction when road reconstruction happens on the street.

Episode metadata supplied by the publisher feed · Published Aug 28, 2019

Embed this episode

Ready to play

Wait, that's MY yard!

0:00 18:30

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Madison's Everyday Engineering?

This episode is 18 minutes long.

When was this Madison's Everyday Engineering episode published?

This episode was published on August 28, 2019.

Can I download this Madison's Everyday Engineering episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!