Watt’s Up: Engie’s Take on BESS and 24/7 CFE episode artwork

EPISODE · Oct 16, 2025 · 38 MIN

Watt’s Up: Engie’s Take on BESS and 24/7 CFE

from The Pexapark Podcast

Welcome back to The Pexapark Podcast! In the first part of the episode, we cover big shifts in renewables: Europe’s day-ahead power market now trades in 15-minute intervals, boosting flexibility and volatility – a win for batteries and flexible demand. Switzerland’s new Acceleration Act aims to cut renewable permitting times dramatically, while Poland stands out with its first major BESS framework deal (1.3 GW / 5.2 GWh).Elsewhere, Germany’s PPA market slowed, the Nordics stayed quiet, and in the UK, solar-plus-storage co-location continues to rise. Meanwhile, Google’s partnership with Shell Energy Europe ushers in a new era of 24/7 carbon-free energy management, hinting at the future of corporate power procurement.In the second half, Luca Pedretti sits down with Katrin Fuhrmann, Managing Director of ENGIE Energy Management Solutions, to discuss how utilities are redefining their role in the renewable transition. Topics include:The rise of multi-technology and hybrid PPAs combining wind, solar, and storageThe evolution from PPAs to Flexibility Purchase Agreements (FPAs) and battery tollingEmerging trends in Germany and Poland’s BESS markets and their financing dynamicsEarly but fast growth: ~3 GW of co-located capacity contracted in 2025 vs 14.5 GW standalone, with two-thirds of new GB solar projects now co-locatedHow 24/7 CFE deals are progressing step by step toward truly green portfoliosUnlock More PPA Market InsightsRegister for your free Pexapark account to stay updated on the latest energy transition trends. Learn more >

Episode metadata supplied by the publisher feed · Published Oct 16, 2025

Embed this episode

Welcome back to The Pexapark Podcast! In the first part of the episode, we cover big shifts in renewables: Europe’s day-ahead power market now trades in 15-minute intervals, boosting flexibility and volatility – a win for batteries and flexible demand. Switzerland’s new Acceleration Act aims to cut renewable permitting times dramatically, while Poland stands out with its first major BESS framework deal (1.3 GW / 5.2 GWh). Elsewhere, Germany’s PPA market slowed, the Nordics stayed quiet, and i...

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

Watt’s Up: Engie’s Take on BESS and 24/7 CFE

0:00 38:58

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Pexapark Podcast?

This episode is 38 minutes long.

When was this The Pexapark Podcast episode published?

This episode was published on October 16, 2025.

Can I download this The Pexapark Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!