Weekly News Reel: Moab city plans for bridge repairs and lead pipe replacements episode artwork

EPISODE · Nov 3, 2024 · 14 MIN

Weekly News Reel: Moab city plans for bridge repairs and lead pipe replacements

from KZMU News · host KZMU News

On the News Reel today, we talk to Doug McMurdo, editor of the Times-Independent. We discuss the city's plans to repair the bridge on 300 South after multiple floods damage infrastructure this summer. We also talk about a federal mandate to replace lead pipes in residential homes. We finish with a story about the state of homelessness in Moab as we look toward the colder months of winter. - Show Notes - • Moab city contracts for new 300 South bridge https://www.moabtimes.com/articles/moab-city-contracts-for-new-300-south-bridge/ • Get the lead out https://www.moabtimes.com/articles/get-the-lead-out/ • Homelessness in Grand County: Unique challenges and community solutions https://www.moabtimes.com/articles/homelessness-in-grand-county-unique-challenges-and-community-solutions/

Episode metadata supplied by the publisher feed · Published Nov 3, 2024

Embed this episode

NOW PLAYING

Weekly News Reel: Moab city plans for bridge repairs and lead pipe replacements

0:00 14:08

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of KZMU News?

This episode is 14 minutes long.

When was this KZMU News episode published?

This episode was published on November 3, 2024.

Can I download this KZMU News episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!