What is being done to save Markman infrastructure episode artwork

EPISODE · Sep 5, 2024 · 17 MIN

What is being done to save Markman infrastructure

from The Herald · host TimesLIVE Podcasts

Tired of being shunted from pillar to post, the Markman Business Forum has launched a public advocacy campaign to compel the metro and the Coega Development Corporation (CDC) to address its proposals to stem the steep decline of infrastructure in the industrial node and across Nelson Mandela Bay. At the centre of the forum’s frustration is access to the Ranger-Neptune link at the Coega Special Economic Zone (SEZ). Tempers flared on June 11 when the forum and a crowd of worker, business and community representatives opened the emergency gate between the northeast end of Markman’s Ranger and Neptune roads on the western edge of the SEZ. The action was intended as a symbolic protest, but the gate was swiftly welded shut by the corporation which has since, according to the forum, demanded access payments of more than R1m. In Behind The Herald Headlines with Daron Mann this week, we speak to Markman Business Forum spokesperson Graham Taylor. The Herald

Tired of being shunted from pillar to post, the Markman Business Forum has launched a public advocacy campaign to compel the metro and the Coega Development Corporation (CDC) to address its proposals to stem the steep decline of infrastructure in the industrial node and across Nelson Mandela Bay. At the centre of the forum’s frustration is access to the Ranger-Neptune link at the Coega Special Economic Zone (SEZ). Tempers flared on June 11 when the forum and a crowd of worker, business and community representatives opened the emergency gate between the northeast end of Markman’s Ranger and Neptune roads on the western edge of the SEZ. The action was intended as a symbolic protest, but the gate was swiftly welded shut by the corporation which has since, according to the forum, demanded access payments of more than R1m. In Behind The Herald Headlines with Daron Mann this week, we speak to Markman Business Forum spokesperson Graham Taylor.

NOW PLAYING

What is being done to save Markman infrastructure

0:00 17:30

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of The Herald?

This episode is 17 minutes long.

When was this The Herald episode published?

This episode was published on September 5, 2024.

What is this episode about?

Tired of being shunted from pillar to post, the Markman Business Forum has launched a public advocacy campaign to compel the metro and the Coega Development Corporation (CDC) to address its proposals to stem the steep decline of infrastructure in...

Can I download this The Herald episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!