EPISODE · May 29, 2026 · 4 MIN
What’s happening with Route 31 between Crystal Lake and McHenry? Here’s the latest on long-term project
from Northwest Herald - Shaw Local · host Shaw Local News Network
ComEd crews are relocating 246 power poles in preparation for the major Route 31 expansion project, expected to start in earnest in 2027 after years of prep work.
Embed this episode
NOW PLAYING
What’s happening with Route 31 between Crystal Lake and McHenry? Here’s the latest on long-term project
0:00
4:10
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Northwest Herald - Shaw Local?
This episode is 4 minutes long.
When was this Northwest Herald - Shaw Local episode published?
This episode was published on May 29, 2026.
Can I download this Northwest Herald - Shaw Local episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!