EPISODE · May 4, 2015 · 3 MIN
What’s Holding Up The REIPPP? - Radio 2000 - 22 April 2015
from GCXAfrica · host GCXAfrica
In the latest round of the Renewable Energy Independent Power Producers Programme, the South African Department of Energy announced that 13 of 77 projects were accepted. But this is equal to only 1 121 MW out of the 5 800 MW that applied. What happened?
Embed this episode
NOW PLAYING
What’s Holding Up The REIPPP? - Radio 2000 - 22 April 2015
0:00
3:50
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of GCXAfrica?
This episode is 3 minutes long.
When was this GCXAfrica episode published?
This episode was published on May 4, 2015.
Can I download this GCXAfrica episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!