When Do You Call It Quits On A Contractor episode artwork

EPISODE · Dec 29, 2022 · 9 MIN

When Do You Call It Quits On A Contractor

from The Self Storage University Podcast · host Frank Rolfe

So you hired a third-party contractor to do something, whatever it may be, striping the pavement, putting in a speed bump, fixing a roll-up door, but then suddenly the relationship gets awkward. It's not working out. It's not functional. Things aren't happening. The question is when do you call it quits with a contractor? We're going to be talking about that strange, sometimes awkward relationship that exists between the self storage owner and the contractor, and it's always on the knife's edge of feast or famine, success or ruin.

Episode metadata supplied by the publisher feed · Published Dec 29, 2022

Embed this episode

Ready to play

When Do You Call It Quits On A Contractor

0:00 9:14

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Self Storage University Podcast?

This episode is 9 minutes long.

When was this The Self Storage University Podcast episode published?

This episode was published on December 29, 2022.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this The Self Storage University Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!