Skip to content
Why Construction Schedules Fail and What Last Planner Does Differently episode artwork

Sep 13, 2026 1 hr 19 min

Why Construction Schedules Fail and What Last Planner Does Differently

from The EBFC Show Hosted by Felipe Engineer Manriquez

Samir Emdanat, President of vPlanner, shares the story behind vPlanner and the decades of project experience, Lean thinking, production planning, and problem solving that led to its creation. Together, Felipe Engineer-Manriquez and Samir explore why traditional construction schedules can become fragile, why the Last Planner System requires more than simply moving sticky notes backward from a milestone, and how teams can use real-time production data to make better decisions. Through stories spanning General Motors, early BIM and 3D workflows, Sutter Health, Integrated Project Delivery, complex healthcare commissioning, takt planning, and the evolution of vPlanner, Samir explains why improving construction starts with understanding the production system before automating it. They also dig into PPC, commitment levels, reasons for variance, visual planning, supply chain activities, Kanban-style workflows, and why trends often tell leaders more than averages. If you are a construction leader, superintendent, project manager, scheduler, Lean coach, production engineer, owner, architect, trade partner, field engineer, or anyone interested in Last Planner System, Lean Construction, takt planning, collaborative planning, or improving construction scheduling, this episode will challenge how you think about plans, metrics, software, and production systems. 📌 Key Takeaways You’ll Gain: Why traditional CPM schedules can create fragile construction plans How Last Planner System differs from simply scheduling backward Why value stream mapping improves collaborative planning How vPlanner grew from solving a complex healthcare commissioning problem Why construction teams should understand a process before automating it How takt planning can improve construction and commissioning workflows Why PPC trends matter more than PPC averages How commitment level and percent required complete reveal different aspects of plan reliability Why teams should track reasons for variance and learn from missed commitments How visual planning helps field teams understand complex production information Why digital planning and physical visuals can work better together How supply chain and procurement activities belong in production planning Why Kanban-style workflows still need construction logic and sequencing How early IPD projects helped advance collaborative planning and production systems Why software should support team behavior instead of replacing good planning How better construction metrics help teams see problems and react faster Follow for more conversations on Lean Construction, Last Planner System, Construction Scrum, leadership, production systems, takt planning, Integrated Project Delivery, AI in construction, collaborative planning, and practical strategies that make construction easier, better, and more human. 🚀 --- Today's episode is sponsored by the Field Verified. Elevate your construction career and enhance your company's performance by mastering the crucial aspect of building enclosure management with Field Verified's specialized training. Address the major challenge of managing building enclosures, a common source of construction failures. Get hands-on learning experience with real-world construction scenarios and mock-up installations for skill-building with leadership and team-focused strategies. By joining our course, you gain access to a proven program that not only covers technical aspects but also better practices for effective construction management. Don't miss this opportunity to transform your approach. Visit https://fieldverified.com for more insights, or contact us at 480-719-5090.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Why Construction Schedules Fail and What Last Planner Does Differently

0:00 1:19:15

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of The EBFC Show?

This episode is 1 hour and 19 minutes long.

When was this The EBFC Show episode published?

This episode was published on September 13, 2026.

Can I download this The EBFC Show episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.