Why did the cost of the wastewater treatment plant balloon to nearly $4 billion? episode artwork

EPISODE · Mar 26, 2024 · 15 MIN

Why did the cost of the wastewater treatment plant balloon to nearly $4 billion?

from The Jas Johal Show · host CKNW / Curiouscast

GUEST: George Harvie, Chair of the Metro Vancouver Board and Mayor of Delta Learn more about your ad choices. Visit megaphone.fm/adchoices

Episode metadata supplied by the publisher feed · Published Mar 26, 2024

Embed this episode

Ready to play

Why did the cost of the wastewater treatment plant balloon to nearly $4 billion?

0:00 15:10

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Jas Johal Show?

This episode is 15 minutes long.

When was this The Jas Johal Show episode published?

This episode was published on March 26, 2024.

Can I download this The Jas Johal Show episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!