Why do modular construction projects fail more often than they should?Modular fails not because the method is flawed, but because teams treat it like traditional construction with a factory in the middle. The coordination requirements are fundamentally different.Topics covered:Why the "factory instead of site" framing is dangerousHow modular is actually a systems integration problemWhere failures really happen—in the gaps between design, production, and siteWhy the factory doesn't remove risk, it relocates it upstreamWhat this means for developers and capitalFor developers, GCs, and capital partners evaluating modular construction.Built Different is produced by Spring Street Management Group. New episodes drop weekdays at 6 AM Pacific.]]>

Episode metadata supplied by the publisher feed · Published Dec 31, 2025

Embed this episode

Modular construction fails not because the method is flawed, but because teams treat it like traditional construction with a factory in the middle. The coordination requirements are fundamentally different.

Distinct summary based on available episode metadata or transcript content.

Ready to play

Why Modular Fails More Often Than It Should

0:00 3:06

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Built Different?

This episode is 3 minutes long.

When was this Built Different episode published?

This episode was published on December 31, 2025.

Can I download this Built Different episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!