Why Most Battery Developers Fail at Zoning? #346 episode artwork

EPISODE · Apr 23, 2026 · 45 MIN

Why Most Battery Developers Fail at Zoning? #346

from Clean Power Hour · host Tim Montague, John Weaver

Eighty-five towns across New York state sit under battery storage moratoriums right now, and two of three Westchester County towns where Joe Tassone Jr. built successful battery projects in 2020 have since banned the technology outright. In this episode, Tim Montague sits down with Joe Tassone Jr., partner at onCORE Origination, a site origination firm working in 25 states on solar, battery storage, data centers, and EV infrastructure. This episode covers the top three issues blocking battery development at the community level, why fire safety fears around lithium-ion storage miss the wider context, and what separates developers who close projects from those who waste millions.Here's what you'll learn in this conversation about battery development and site origination:You'll hear the three biggest objections communities raise against battery storage projects.Find out why 85 New York towns currently sit under battery moratoriums, and how two of three Westchester County towns where Joe built projects in 2020 have since banned storage outright.Learn why Joe argues developers should never treat zoning as black and white, even in towns with outright bans, because public utility statutes and use variances open paths to approval through the judicial process.Understand how state-level programs in Illinois, Maryland, and Connecticut remove local NIMBY obstacles.You'll get Joe's three tenets of successful development: knowing where to go through parcel acumen, committing fully to a market with a clear pipeline vision, and persisting relentlessly through headwinds.Joe's 30 years of site origination experience surfaces one clear lesson: developers who treat zoning as static codes and give up at the first denial lose tens of millions in project value every year. The industry needs to move from reactive to proactive, meeting with town and county associations before moratoriums pass instead of reacting after.Connect with Joe Tassone Jr Joe Tassone Jr. LinkedIn: https://www.linkedin.com/in/joseph-f-tassone-jr-a778a1190/onCORE Origination Website: https://oncoreorig.com/ Support the showConnect with Tim  Clean Power Hour  Clean Power Hour on YouTubeTim on TwitterTim on LinkedIn Email [email protected] Review Clean Power Hour on Apple PodcastsThe Clean Power Hour is produced by the Clean Power Consulting Group and created by Tim Montague. Contact us by email:  [email protected] sponsors who share our mission to speed the energy transition are invited to check out https://www.cleanpowerhour.com/support/The Clean Power Hour is brought to you by CPS America, maker of North America’s number one 3-phase string inverter, with over 6GW shipped in the US. With a focus on commercial and utility-scale solar and energy storage, the company partners with customers to provide unparalleled performance and service. The CPS America product lineup includes 3-phase string inverters from 25kW to 275kW, exceptional data communication and controls, and energy storage solutions designed for seamless integration with CPS America systems.  Learn more at www.chintpowersystems.com

Episode metadata supplied by the publisher feed · Published Apr 23, 2026

Embed this episode

Eighty-five towns across New York state sit under battery storage moratoriums right now, and two of three Westchester County towns where Joe Tassone Jr. built successful battery projects in 2020 have since banned the technology outright. In this episode, Tim Montague sits down with Joe Tassone Jr., partner at onCORE Origination, a site origination firm working in 25 states on solar, battery storage, data centers, and EV infrastructure. This episode covers the top three issues blocking b...

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

Why Most Battery Developers Fail at Zoning? #346

0:00 45:02

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Clean Power Hour?

This episode is 45 minutes long.

When was this Clean Power Hour episode published?

This episode was published on April 23, 2026.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Clean Power Hour episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!