Why subcontractors should never walk off site when they are not getting paid. (EP 125) episode artwork

EPISODE · Jul 10, 2023 · 41 MIN

Why subcontractors should never walk off site when they are not getting paid. (EP 125)

from Own The Build · host C-Link

In the studio today, Paul is joined by Guy Jackson, who is the Founding Partner at Overford, a chartered quantity surveying practice that specialises in problem-solving complex construction and engineering matters.Guy is a Fellow of the RICS and the CIArb and holds a BSc in Construction Commercial Management, an MSc in Construction Law and Dispute Resolution, and a Graduate Diploma in Law.In today’s conversation, Guy and I debate the best strategies for both Main and Subcontractors when the subcontractor threatens to walk off-site due to payment. We discuss why subcontractors should never walk off-site and, instead, what they should do while at the same time looking at things from a main contractor’s perspective too.This happened to me a lot, so it was a great debate, and I think you will enjoy it too.Your free OTB downloadsAs promised at the top of the show - I’ve shared a link to the Design & Build download below: Implications and Opportunities of a Design & Build Contract--Want to connect with Paul?Paul is on Linkedin here and would love to talk. You can also connect with Paul at [email protected] or through, C-Link. C-Link is software built by Quantity Surveyors for Main Contractors. We save 600 hours of Quantity Surveying time per project in automation. We can make your QS’ so much more efficient.Book a demo to learn more by clicking here.Send us Fan MailWant to connect with Paul?Paul is on Linkedin here and would love to talk. You can also connect with Paul at [email protected] or through, C-Link. C-Link is software built by Quantity Surveyors for Quantity Surveyors. We save 600 hours of Quantity Surveying time per project in automation. We can make your QS’ so much more efficient.Watch the Video to learn more; you can book a demo by clicking here. 

In the studio today, Paul is joined by Guy Jackson, who is the Founding Partner at Overford, a chartered quantity surveying practice that specialises in problem-solving complex construction and engineering matters. Guy is a Fellow of the RICS and the CIArb and holds a BSc in Construction Commercial Management, an MSc in Construction Law and Dispute Resolution, and a Graduate Diploma in Law. In today’s conversation, Guy and I debate the best strategies for both Main and Subcontractors when t...

NOW PLAYING

Why subcontractors should never walk off site when they are not getting paid. (EP 125)

0:00 41:34

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of Own The Build?

This episode is 41 minutes long.

When was this Own The Build episode published?

This episode was published on July 10, 2023.

What is this episode about?

In the studio today, Paul is joined by Guy Jackson, who is the Founding Partner at Overford, a chartered quantity surveying practice that specialises in problem-solving complex construction and engineering matters.Guy is a Fellow of the RICS and the...

Can I download this Own The Build episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!