Will the George Massey Tunnel replacement ever actually get built? episode artwork

EPISODE · Jun 17, 2026 · 27 MIN

Will the George Massey Tunnel replacement ever actually get built?

from This is Vancouver

The B.C. NDP says the $4.15-billion George Massey Tunnel replacement project is still on track... even though this week Transportation Minister Mike Farnworth announced they are terminating their deal with the design-build consortium the government had selected to do the bulk of the work. So where does that leave the project? And what will it mean for the tens of thousands of people waiting for a fix?

Episode metadata supplied by the publisher feed · Published Jun 17, 2026

Embed this episode

Ready to play

Will the George Massey Tunnel replacement ever actually get built?

0:00 27:29

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of This is Vancouver?

This episode is 27 minutes long.

When was this This is Vancouver episode published?

This episode was published on June 17, 2026.

Can I download this This is Vancouver episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!