Skip to content
William Perkins Case Study - Keys to Rapid Construction episode artwork

Aug 1, 2022 21 min

William Perkins Case Study - Keys to Rapid Construction

from WoodSolutions Timber Talks

William Perkins High School consists of a significant quantity of exposed wooden structures, enabling the benefits of biophilia for the students and building occupants. Education buildings have the unique challenges, when trying to build in the short windows that sit between teaching periods. Within these windows the building was constructed with an innovative team and creative engineers. In this episode, we're speaking with Alan Dowdall, the project structural engineer, a timber specialist with vast experience about achieving fast programs in construction and the importance of simplicity in design. If you want to learn more about designing or building with timber, I recommend you go to the WoodSolutions Website and download the Technical Design Guides: https://www.woodsolutions.com.au/publications I recommend watching the WoodSolutions weekly webinars. Previous recordings can be found on the WoodSolutions website: https://woodsolutions.com.au/

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

William Perkins Case Study - Keys to Rapid Construction

0:00 21:12

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of WoodSolutions Timber Talks?

This episode is 21 minutes long.

When was this WoodSolutions Timber Talks episode published?

This episode was published on August 1, 2022.

Can I download this WoodSolutions Timber Talks episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.