EPISODE · Aug 18, 2026 · 1 MIN
Wisconsin River Bridge Reroute Begins | Madison News
from Madison News Today | 2 Min News | The Daily News Now!
Big change ahead for Wisconsin drivers: Starting August 19, traffic on I-39/90/94 will shift to the new northbound bridge over the Wisconsin River, kicking off demolition of the old span and construction of the southbound bridge. Despite the work, three lanes in each direction will stay open during peak hours. The full project is on track to wrap up by fall 2028 — a major milestone for this long-term infrastructure upgrade. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/ad1e968185bb91a5
Embed this episode
NOW PLAYING
Wisconsin River Bridge Reroute Begins | Madison News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.