Wisconsin River Bridge Reroute Begins | Madison News episode artwork

EPISODE · Aug 18, 2026 · 1 MIN

Wisconsin River Bridge Reroute Begins | Madison News

from Madison News Today | 2 Min News | The Daily News Now!

Big change ahead for Wisconsin drivers: Starting August 19, traffic on I-39/90/94 will shift to the new northbound bridge over the Wisconsin River, kicking off demolition of the old span and construction of the southbound bridge. Despite the work, three lanes in each direction will stay open during peak hours. The full project is on track to wrap up by fall 2028 — a major milestone for this long-term infrastructure upgrade. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/ad1e968185bb91a5

Episode metadata supplied by the publisher feed · Published Aug 18, 2026

Embed this episode

NOW PLAYING

Wisconsin River Bridge Reroute Begins | Madison News

0:00 1:07

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Madison News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Madison News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on August 18, 2026.

Can I download this Madison News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!