EPISODE · Aug 26, 2026 · 2 MIN
Work begins at I-39 and U.S. 52 interchange in La Salle County
from Illinois Valley - Shaw Local · host Shaw Local News Network
Work consists of patching the interchange ramps and the pavement on U.S. 52 before the I-39 bridge crossing. The $639,000 project is expected to be completed in October.
Embed this episode
Ready to play
Work begins at I-39 and U.S. 52 interchange in La Salle County
0:00
2:19
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Illinois Valley - Shaw Local?
This episode is 2 minutes long.
When was this Illinois Valley - Shaw Local episode published?
This episode was published on August 26, 2026.
Can I download this Illinois Valley - Shaw Local episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!