Work on underpass project in HCMC suspended
from Saigon Times Podcasts Hosted by The Saigon Times
Work on the Nguyen Van Linh-Nguyen Huu Tho underpass project in District 7, HCMC has been temporarily suspended.
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of Saigon Times Podcasts?
This episode is 6 minutes long.
When was this Saigon Times Podcasts episode published?
This episode was published on October 3, 2022.
Can I download this Saigon Times Podcasts episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.