Workshop Episode: CG's ongoing electronics tests, Jesse's Level 3 project episode artwork

EPISODE · Sep 26, 2020 · 1H 29M

Workshop Episode: CG's ongoing electronics tests, Jesse's Level 3 project

from The Rocketry Show

In this episode, CG talks about how his electronics developments have come along  Specifically, what he learned from the first test flight of Mr. Bean (DEMO-1 mission), and the successful second launch of Mr. Bean (DEMO-2), where his code & flight computer successfully controlled a flight event!  His journey to his Level 2 certification is under way!  Read the details here.  CD and Gheem @ “Mission Control” Jesse’s Level 3 project starts to take shape!  He gives us some details, though he’s a bit secretive on the details right now!  Another view of Jesse’s L3 Rocket  Jesse’s tube glassing work on his L3 rocket project Liked it? Take a second to support The Rocketry Show.Com on Patreon!  

Episode metadata supplied by the publisher feed · Published Sep 26, 2020

NOW PLAYING

Workshop Episode: CG's ongoing electronics tests, Jesse's Level 3 project

0:00 1:29:30

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of The Rocketry Show?

This episode is 1 hour and 29 minutes long.

When was this The Rocketry Show episode published?

This episode was published on September 26, 2020.

What is this episode about?

In this episode, CG talks about how his electronics developments have come along  Specifically, what he learned from the first test flight of Mr. Bean (DEMO-1 mission), and the successful second launch of Mr. Bean (DEMO-2), where his code & flight...

Can I download this The Rocketry Show episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!