EPISODE · Mar 18, 2021 · 29 MIN
WV On The DOT - 32 - Joe Pack Smooth Roads And District 10 Project Update
from WV on the DOT · host WV on the DOT
This week's WV on the DOT podcast features District 10 Engineer, Joe Pack talking about smooth roads and major projects from the slip on Route 19 in Spanishburg, to the King Coal Highway, to the Grant Street Bridge.
Embed this episode
NOW PLAYING
WV On The DOT - 32 - Joe Pack Smooth Roads And District 10 Project Update
0:00
29:36
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of WV on the DOT?
This episode is 29 minutes long.
When was this WV on the DOT episode published?
This episode was published on March 18, 2021.
Can I download this WV on the DOT episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!