xAI's power pays episode artwork

EPISODE · Jan 14, 2026 · 17 MIN

xAI's power pays

from The AM/DM · host The Daily Memphian

For much of its first year in existence, xAI used Tesla Megapacks and portable natural gas turbines — in addition to some power from Memphis Light, Gas and Water — to power Colossus, its first area data center. But the artificial intelligence company's local power usage ramped up in April of 2025, after the company appeared to fully connect to a newly constructed MLGW substation. Today, we talk about the amount of power xAI is using, as well as what they are using it for, and how it fits into the national conversation.  Plus: Grizz coach says there is a chance Ja will play in Europe The Commission steps in to pay the county clerk's rent in Millington New home developments could increase in Lakeland The County Commission votes to keep all nine board seats on the 2026 ballot Some pre-K classrooms could close within 30 days without county funding

Episode metadata supplied by the publisher feed · Published Jan 14, 2026

Embed this episode

Ready to play

xAI's power pays

0:00 17:40

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The AM/DM?

This episode is 17 minutes long.

When was this The AM/DM episode published?

This episode was published on January 14, 2026.

Can I download this The AM/DM episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!